Showing posts with label floats. Show all posts
Showing posts with label floats. Show all posts
Saturday, August 29, 2009
Snakes on a Seaplane
I was flying the seaplane today on Yates lake just below Lake Martin Dam. I often go here when the main lake is more busy than I would prefer. There are only a few houses on the lake and very few boats. It is about 10 miles long and 1500 feet wide for most of its body. It is an awesome seaplane lake with often perfectly glassy water since it is down in a canyon of sorts. Today my student and I were idling around in the middle of the lake just appreciating mother nature's grandure when my student noticed something moving pretty fast in the water. It looked like a large snake swiming across the lake. We taxied over to investigate, and sure enough it was a snake about four feet long . It was apparently as interested in the seaplane as we were in it. As we taxied by, it climbed up onto the back of the right float. It did not look happy, but then again, what makes a snake look happy? It stared at me as I peered through my open window and kind of rared back like it wanted to strike. I was too far away and inside the plane, which was where I intended to stay. I was concerned that it might find a more secure perch on the plane or maybe even gain access to the cockpit, but this was unlikely. I was not about to get out. I am sure that the weight and balance was not good with a ten pound snake that far back on the float. We gunned the plane a bit and it decided to depart the float. Now I was mad at myself for not snapping a picture with my iPhone.
Labels:
flight instruction,
floatplanes,
floats,
seaplanes,
snakes,
wildlife
Tuesday, August 25, 2009
Rejuvenation - Assembly
The paint is finally done and the floats are attached. The plane is starting to look like a plane again. Every piece that we add back on takes us one step closer to flying again. While the deconstruction was interesting and it was nice to be "Out with the old" putting stuff back together is way more inspiring. We had been pretty careful during the deconstruction to make sure that every piece is accounted for. Unless this is done religiously, the construction phase will be trouble. Many of these parts are hard to find and expensive. Some nuts are in the hundreds of dollars. We did a great job of being careful and we found pretty much everything that we needed to put the plane back into flying condition. One of the most difficult operations was putting the wings back on. This required 4 people. Two of us held the wing while the mechanic attached the bolts. There are only a few bolts but the tolerances are very tight where they go. There are only 4 bolts that hold a wing on. Two hold the strut and two hold the wing root to the plane. The first three bolts seem to go pretty easily. The last one always seems to be tough. It took a couple of hours to attach both wings. The prop and the spinner and all the control surfaces went on pretty easilly as well. After about 2 days we had a complete plane. All painted and ready to go, except for the leak test on the floats. We went ahead and fueled the plane and ran it. The plane is very "tippy" on the trailer. If you get too far back on the floats it will fall back onto the back part of the floats. We strapped the plane down to keep it stable. It felt very nice to spend some time in the completed cockpit and to actually hear the engine run. It started easily and ran perfectly. We kept it running for about 15 minutes. I was very happy for about 20 minutes. We then decided to do a leak test on the floats, by putting water in them with the hose. There were very many leaks. My hopes of flying were dashed for several days while thinks dried out and more sealant was applied.
Labels:
aircaft maintenance,
floats,
Flying,
seaplanes
Monday, August 24, 2009
Rejuvenation - Geometry
We had been very careful to leave the float attachment gear on the plane and not to touch the flying wires that keep everything in line, but as the time came to paint the floats and all of this gear, we decided to remove it and thus do a better job painting these parts. So we built a rig to raise the plane from the lifting rigs on top. These rings are good for lifting straight up, but it is not good to put a side load on them, so we used a 6x6 piece of lumber and ran eye bolts through them. We then attached chain via shackles to the eye bolts and we lifted the plane using a chain hoist that we purchases for about $90 from Harbour Frieght. The chain hoist worked really well since it is a gentle and controlable lift. The chain will scratch or remove paint if you are not careful with it. We raised the plane gently supporting the tail with another human. Once the plane was up it was pretty stable. We then unbolted the attachment gear. This is another on of those things that is really strong as long as everything is attached and tight, but it turnned into a pile of spaggetti when off the plane. It is important to keep track of which parts go where and to remove as few parts as possible. Once some of the tubes were off I was able to really clean out some "years old" dirt dauber nests from inside the tubes. More useful load for me.... We reversed the process once everything was painted. We installthed the attachment gear to the floats first while they were on the trailer. We rolled the trailer under the raised airplane and lined everything up as best we could and lowered the plane to the gear. It took several hours to get everything attached, but not tight. The tightening would wait until we got the geometry straight. It would not do to have the floats improperly aligned with the plane or each other. All these things are possible with the miriad of possible adjustments. We found points on each wing as a reference and tightened this and loosened that until everything came into alignment. This was not nearly as bad a process as I imagined. We did a great job, because the first landing was very comfortable.
Labels:
aircaft maintenance,
floatplanes,
floats,
Flying,
seaplanes
Thursday, August 20, 2009
Rejuvenation - Skining the floats
It took as long or longer to pull the bottoms off as it did to replace them. Once the skins were off we could really inspect the insides of the floats. They were really in pretty good shape. We also decided to replace the middle and front bulkheads. One was dented really badly, and the middle bulkheads were pretty corroded. Now was the time to do it while the skins were off. This process took about a month. We ordered new parts from EDO, the float manufacturer, and Peck Aero Products in Canada. http://peckaero.com/ Ed Peck owns the operation and he was very very knowlegable and helpful. He even offered to reskin the floats for me. I winced at the thought of all that shipping and delay. In hindsight it might have been a good plan. We learned many lessons pulling these things apart and putting them back together that I am sure Ed learn a long long time ago and not at the expense of my time and the quality of the job that we did on my floats. I had lots fo bonding time with my mechanic and I learned a ton. I probably spent $3250 on float parts. They were all very pretty and shiney and new when they arrived. We used the old skins for a template for the new ones and we got to drill thousands of new holes in these very shiney and new parts. Once all the holes were drilled we started assembly. This was very exciting to see. I had witness so much destruction as the dead parts were removed and now they were being replaced with shiney new parts. When the float skins come off the float loses a bunch of its strength and the become flimsey. As the new parts were added back on everything became strong again. Very satisfying. I was starting to get the itch to fly the plane really badly now. All the ribs and doublers were added to the bottom skins before they were applied to the rest of the float. This made the rivets much easier to install. There are only about 40-50 rivets that have to be installed using two people. One person is on the bottom of the float shooting the rivets while the other is reaching in through the inspection hole trying to buck the rivet. Doing all of this you end up covered in sealant as well. We used latex glove for most of this process and the sealant would really stick to everything. The sealant is a two part substance that actually mixes inside the tube and it has a relatively short shelf life of 6 weeks and a working time that you can choose when you buy the tube. Some of the stains from the sealant will be a part of my wardrobe for years to come.
Labels:
aircraft maintenance,
airplanes,
floats,
seaplanes,
skinning floats
Subscribe to:
Posts (Atom)